Monday, September 5, 2016

Where we are now..

When we last checked in, the floor of the shower had been grouted leaving the walls and the floor.

DSC_0001

Next came the spackle, sand, spackle, sand, spackle, sand and paint but you don’t need to see those pictures.  The ones you really want to see are from this weekend.

DSC_0001

Here’s the vanity, mirror and light fixture.  We still haven’t settled on a top it has to be custom whatever it is.  The space on the wall next to the light switch will be a small niche with a shelf.

DSC_0004

Here’s the linen cabinet it fit perfectly in the little corner and left plenty of room for hooks on the wall for towels.

DSC_0005

Here the shower fixtures have all been installed and yes that’s water raining out of the shower head!

The toilet is also installed and useable but you don’t really need to see a close up of that.

So what’s left before we are done?  Well I’ve got to get the glass panel for the shower ordered.  The vanity top obviously and a little plumbing to hook that up.  We are in the home stretch for this project!

No comments: